wall form system

FOB Reference Price:Get Latest Price
$700.00 - $1,050.00 / Tons | 20 Ton/Tons (Min. Order)
Color:
gray
Report Suspicious Activity
Overview
Quick Details
Place of Origin:
Hebei, China (Mainland)
Brand Name:
XMWY
Model Number:
xmwy001
Material:
Q235 cold rolled steel
Reusable:
Durable for reuse about 300 times
Color:
Gray or yellow
Market:
Both in and out China
Surface:
Electrophoretic painting,anti-rust
Certificates:
ISO9001 ISO14001 ISO18001
Low cost:
Competitive price
Accessories:
tie rod, inner outer corner,cross shape spacer
recycle times:
300 times
Main Exporting areas:
Southeast Asian
Supply Ability
Supply Ability:
300 Ton/Tons per Day timely delivery
Packaging & Delivery
Packaging Details
suitable for transportation or according to customers' request
Port
XINGANG TIANJIN CHINA
XM

Working there with happiness.

A harmonious and efficient working environment.

Efficient honesty pragmatic management work By heart.

wall formwork
column Information
name
innovation shear wall with patent

specification
vertical beam 2.2-2.6m/2.6-3m
cross beam2.4/1.5/1.2/0.9/0.6m
material
Q253 Cold steel
installation
quick and easy installation
wall thickness
2.5mm
recycle times
300times
advantage
replace wood, high load bearing
 capacity
Benefit for you

1. Saving labor and material

Due to the excellent performance of the material, under normal circumstances can reuse of 300 times,

thereby significantly reducing the cost of single use, at the same time, has many times reuse can

effectively and avoid the template repeatedly procurement and transportation to bring additional time

and cost, but also accelerate the construction progress.Template using modular assembly, handle

connection, reducing the overall nails,wire, wood, flute and so on auxiliary use cost, and wood processing, equipment leasing costs.


2. Flexible construction
 

For column mode, the design of the different types, can be adjusted arbitrarily according to the size of

column, basic coverage column die size required, and all column form innovation design of pulling out of hole, the die pillar reinforcement than traditional template reinforcement more simple.
Convenient pouring. On the wall, in one column, pouring, can also be a separate column, wall, floor slab

casting.


3. Safety and environmental protection

The use of composite,reduce the discharge of construction garbage, at the same time, the template is damaged, to repair the hole; after the abolition of the template, recycling utilization, increases the mould of the residual value, thereby reducing the environmental pollution and reduce the negative impact on the environment.


FAQ

Q1. What is your terms of packing?
A: Generally, we pack our goods in neutral white boxes and brown cartons. If you have legally registered patent,
we can pack the goods in your branded boxes after getting your authorization letters.

Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages
before you pay the balance.

Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.

Q4. How about your delivery time?
A: Generally, it will take 30 to 60 days after receiving your advance payment. The specific delivery time depends
on the items and the quantity of your order.

Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.

Q6. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and
the courier cost.

Q7. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery

Q8: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them,
no matter where they come from.

other products

Green construction environment can be provided.

Green construction environment can be provided.

customers visit

All in all meet customers demand in short time and provide good service for customers.
1.Provide good service and help to find the question when customers are in trouble, solve the problem as soon as i know.
2.Precise calculate drawings depends on CAD to save money. make a plan for you and let you know how to save money and let customers feel comfortable the process they plan to purchase.
3.make a quotation for customers
4.Reception customers see factory

contact me

Chloe Teng
Iternational Trade Dept.
Changli XingMinWeiYe Architecture Equipment Limited Corporation
whatsapp:008615603394723
Skype: xmwyzhy   wechat:b99440





You May Like
Not exactly what you want? 1 request, multiple quotations Get Quotations Now >>
You May Like